Decorating Between Tenancies: When and How

Fresh paint sells a let faster than almost anything else. Here is when to do it, what to spec, and where to draw the line.

Smart Sleep Property Editorial Team 22 June 2026 8 min read
On this page+
  1. Decide: touch-up or full redecorate
  2. Colour and finish
  3. Specifications worth paying for
  4. Costs
  5. Timeline
  6. When DIY makes sense
  7. What to skip
  8. Combining decoration with other works
  9. What sells the property after painting
  10. Common mistakes
  11. Bottom line

# Decorating Between Tenancies: When and How

Paint is the cheapest way to make a tired property feel new. A fresh-painted flat lets faster, achieves higher rent, and attracts better-quality applications. Skipping it to save £400 can cost three weeks of void.

Decide: touch-up or full redecorate

Touch-up (every tenancy)

  • Walls clean, no major marks beyond cleaner-friendly scuffs.
  • Last full decoration within 3–5 years.
  • Spot-fill cracks, sand back, dab paint over marks.
  • 3–6 hours of work, £30–£80 in materials.

Full redecorate (every 5–7 years)

  • Last decoration 5+ years ago.
  • Multiple scuffs, marks, faded colour.
  • Yellowed ceilings.
  • Tenant change after long tenancy.
  • New rent banding (raising rent to market post-refresh).

If in doubt, the smell test: walk in like a prospective tenant. Does it feel "lived-in" or "fresh"?

Colour and finish

Stick to a neutral palette that suits all tastes and ages well:

  • Walls: warm off-white. Dulux Trade ''Vanilla Sundae'', ''Almond White'', or any white-with-a-hint-of-warmth.
  • Ceilings: brilliant white, matt emulsion.
  • Woodwork (skirting, architraves, doors): brilliant white, satinwood or eggshell.
  • Hallways and stairwells: the same off-white but in a more durable finish.

Finishes by room:

RoomWallsCeiling
Bedrooms / loungeMatt emulsionMatt emulsion
Hall / stairs / landingMid-sheen (durable) emulsionMatt
KitchenMid-sheen / kitchen-specificMatt
BathroomAnti-mould / bathroom-specificAnti-mould

Skip: feature walls, deep colours, anything fashionable. They date fast and limit your applicant pool.

Specifications worth paying for

  • Trade-grade paint — Dulux Trade, Crown Trade, Johnstone''s Trade. Better coverage, more washable, only marginally more expensive.
  • Anti-mould paint in wet rooms — Polycell 3-in-1 or Dulux Trade Bathroom.
  • Stain-block primer — for water marks, mould patches, nicotine stains. Without it, marks bleed through new paint.
  • Tin per room rule — buy 5L per room as a starting point.

Costs

For a 2-bed flat (typical 60 sqm floor / 180 sqm wall area):

  • DIY: £200–£400 in paint and consumables.
  • Decorator (touch-up + accent repaint): £400–£700.
  • Full redecorate by decorator: £900–£1,800.

Per square metre of wall area: £6–£12 covering labour and materials at trade rates.

Timeline

A small flat full redecorate:

  • Day 1: Prep — fill, sand, mask, dust sheets.
  • Day 2: Ceilings + walls first coat.
  • Day 3: Walls second coat + woodwork.
  • Day 4: Touch-ups, snags.
  • Day 5: Clean, photographs, listing live.

Allow 5 working days from check-out to "ready to view". Trying to compress to 2 days produces visible defects and re-do costs.

When DIY makes sense

  • One property, you have the time and ability.
  • Touch-ups only.
  • Outside the cleaning trade''s reach (e.g. above stairwells).

Honestly assess: a decorator''s 2 days produces a better finish than your 5 days. For a landlord paying mortgage and council tax on a void, that often pays back the labour cost.

What to skip

  • Wallpaper — unfashionable, time-consuming, depreciates.
  • Feature walls in trendy colours.
  • Specialist textured finishes.
  • Repainting wood floors (sand and seal instead).

Combining decoration with other works

End-of-tenancy is when the property is empty — ideal for:

  • Carpet replacement or deep clean.
  • Boiler service.
  • Window seal repairs.
  • Smoke alarm replacement.
  • Bathroom regrout / silicone refresh.
  • Locks rekey.

Bundling reduces total downtime vs spreading over multiple visits.

What sells the property after painting

  • Professional photos within 48 hours.
  • Listed across Rightmove, Zoopla and SpareRoom (if applicable).
  • Cleaned to "hotel standard".
  • All bulbs working.
  • Empty enough to feel spacious; staged enough to feel homely.

Common mistakes

  • Cheap supermarket paint — needs three coats, weaker washability.
  • Skipping primer over stains — bleed-through within weeks.
  • Bright/feature colours — alienates 80% of applicants.
  • Repainting before fixing damp — paint flakes and you redo.
  • Not allowing drying time before viewings — smell drives tenants away.
  • Tenant moves in before paint fully cured (allow 7 days for full cure).

Bottom line

Fresh paint is the highest-ROI cosmetic spend in lettings. Budget £400–£1,500 between tenancies; use neutral colours and durable finishes; combine with other turnover works; never compromise drying time. The few hundred pounds saved by skipping is paid back many times over in void weeks.

Frequently asked questions

Do I have to redecorate between every tenancy?+

No — touch-ups are usually enough. Full redecoration every 5–7 years or where condition demands.

What colour should I paint?+

Warm off-white walls, brilliant white ceilings and woodwork. Avoid feature colours and wallpaper.

What is the best paint for a rental?+

Trade-grade emulsion (Dulux Trade, Crown Trade) — washable, durable, only slightly more expensive than DIY brands.

How much should I budget?+

£400–£700 for touch-ups, £900–£1,800 for a full 2-bed redecorate by a professional.

Can I deduct decoration from rental income?+

Yes — redecoration is a revenue repair, fully deductible. Improvements (e.g. installing new features) are capital.

Should I use eggshell or satinwood on woodwork?+

Either — both are durable and washable. Eggshell looks more contemporary; satinwood is more traditional.

Do I need to seal mould before painting?+

Yes — treat with fungicidal wash, dry fully, use stain-block primer, then anti-mould paint. Painting over mould without this leads to re-growth in weeks.

How long should paint dry before tenants move in?+

Walls should be touch-dry in 2 hours, recoat in 4. Allow at least 48 hours before move-in and ventilate well. Full cure can take 7+ days.

Should I use feature walls?+

No — dates fast, narrows your applicant pool. Stick to neutral throughout.

Is wallpaper worth it?+

For a rental, no. Time-consuming to hang, easily damaged, hard to repair, looks dated quickly.

What about painting wooden floors?+

Avoid — sand and seal instead. Painted floors chip quickly and look poor.

Can I charge the tenant for redecoration on check-out?+

Only if damage exceeds fair wear and tear. Routine end-of-tenancy redecoration is a landlord cost — deposit deductions for normal scuffs rarely succeed at adjudication.

Rated 5/5 by landlords — read reviews
UK landlords — self-managing made easy

Get the tools to handle this confidently

Our Membership gives self-managing landlords across the UK Renters' Rights Act–compliant tenancy templates, compliance reminders, document storage and member pricing on services — from just £9/month.

References & official guidance